EXTERNAL TREATMENT : MASONARY FOUNDATION
A) Dig shovel width trenches along the external wall of the building exposing the foundation wall surface upto a depth of deep rod holes apart all along this trench. Pour this premium Termite emulsion per running meter. B) Treat the back fill earth, while returning it to the trench with Termite emulsion, directing the spray towards the wall surface.
MASONARY APRON
If there is a concreate or masonary apron around the building, drill 6.5mm holes as close as possible to the plinth wall, 30cm apart. Pump Termite to soak the soil.
RCC FRAMED STRUCTURE
Incase of RCC framed structures with columns and plinth beams and RCC basements, the treatment can start at a depth of 50 cm below ground level. Excavate shovel width trenches exposing the sides of the column and plinth beams upto 30cm (or bottom of the plinth beam) and treat the backfill earth with Termite emulsion while returning it to the trench of the vertical surface of the structure.
A wide array of preventive post construction termite control services is offered by our organization. Looking at the huge demands of the clients regarding these protective measures, we develop and offer theses services. We make these services affordable to the clients are deliver whenever they are required.
|  |